KEEP IN TOUCH WITH DEVELOPMENTS

NEWS / EVENTS

For specific case histories, fuller details will be issued shortly.

ZEiTECS is pleased to announce that the first commercial installation of the Shuttle 550 was installed in Brunei. The installation and testing went very successfully, initial start up has been delayed due to reallocation of the surface VSD to a higher priority well. Both BSP and ZEiTECS expect the well to produce at its' design rate when on full production. A Shuttle 550 installation allows upto a 400/456 ESP/motor combination to be run and retrieved through 5 1/2" tubing.

 

A case study is in preparation and will be available as soon as possible